C
CLR
Hi All.............
Just was working out a problem and in A1 put 12/31/2005
and in B1 put =DAY(A1), formatted as Custom dddd, and the result came out
TUESDAY. Then when I copied both cells down, A2 became 1/1/2006 and B2
became Sunday, as they should be, etc etc on down.........
I dropped down to A8 and entered 12/25/2005 and in B8 put =DAY(A8) and I got
WEDNESDAY. By then copying down, these followed that sequence to 12/3102005
being TUESDAY again and when it switched to 1/1/2006 in A15, then B15 became
Sunday as it should be, and was correct from there on down...........
Anybody know what's up with that?
Vaya con Dios,
Chuck, CABGx3
Just was working out a problem and in A1 put 12/31/2005
and in B1 put =DAY(A1), formatted as Custom dddd, and the result came out
TUESDAY. Then when I copied both cells down, A2 became 1/1/2006 and B2
became Sunday, as they should be, etc etc on down.........
I dropped down to A8 and entered 12/25/2005 and in B8 put =DAY(A8) and I got
WEDNESDAY. By then copying down, these followed that sequence to 12/3102005
being TUESDAY again and when it switched to 1/1/2006 in A15, then B15 became
Sunday as it should be, and was correct from there on down...........
Anybody know what's up with that?
Vaya con Dios,
Chuck, CABGx3