Hi,
I have defined a task. I assign 2 Material resources viz. MatA (2ft) &
MatB(4ft). Now i have a problem. How do i track the actual usage. i.e
if suppose instead of 2Ft only 1Ft of MatA is used how do i track that.
I tried adding the Actual work column, but it does not allow me to add
anything. If i view the resource usage it shows Work, but Actual work
is not populated how do i do that.
I short i want to track the planned materials vs Actual Materials.
Thanks
Pradeep