R
Rachel
Project Pro is not allowing me to update % completes in the client, I am only
able to enter them in PWA. If a % complete is already populated, and I assign
a resource to the task I receive the following error:
Your action may result in actuals this project becoming out of synch with
the actuals updated from timesheets. You can: synch actuals with the Synch
actuals command on the Tracking menu, or synch actuals when you save the
project.
When I click Yes, the % complete is changed back to 0.
I've never had this problem before. Any suggestions? I need to be able to
adjust % completes in the client.
Thanks,
Rachel
able to enter them in PWA. If a % complete is already populated, and I assign
a resource to the task I receive the following error:
Your action may result in actuals this project becoming out of synch with
the actuals updated from timesheets. You can: synch actuals with the Synch
actuals command on the Tracking menu, or synch actuals when you save the
project.
When I click Yes, the % complete is changed back to 0.
I've never had this problem before. Any suggestions? I need to be able to
adjust % completes in the client.
Thanks,
Rachel