I am launching Project Server 2003 and would like to integrate with an
existing WSS infrastructure but I need to know if there is added load to the
WSS site by doing so. Does integrating Project with WSS increase the load on
WSS or is it simply another chanel/door for existing usage? I mean people
already connect to WSS to create docs and collaborate right? Is integrating
Project adding any more load or just providing another means to get to those
docs and collaborate? What about Risks and Issues does that Project
functionality add any significant load?
I'm new to all this and soaking up all I can, thanks for any insight.
existing WSS infrastructure but I need to know if there is added load to the
WSS site by doing so. Does integrating Project with WSS increase the load on
WSS or is it simply another chanel/door for existing usage? I mean people
already connect to WSS to create docs and collaborate right? Is integrating
Project adding any more load or just providing another means to get to those
docs and collaborate? What about Risks and Issues does that Project
functionality add any significant load?