Micah
In 2007, sp2, I added the duration field to a Resource Assignment view. Now
when I go to this view, I get a IE box that tells me PWA cannot access
project server. after accepting the dialog box, the view gives me no
information. I tried creating a new view. It work correctly until I add the
duration field. Then the same error box. If I remove the duration field from
the view, it works correctly again. I'm looking at a resource that has 3
projects and several task, all show up when duration field is not in the
view. Do I need to perform some addition steps to overcome this? Is there a
cube that contains duration, project or task level?
when I go to this view, I get a IE box that tells me PWA cannot access
project server. after accepting the dialog box, the view gives me no
information. I tried creating a new view. It work correctly until I add the
duration field. Then the same error box. If I remove the duration field from
the view, it works correctly again. I'm looking at a resource that has 3
projects and several task, all show up when duration field is not in the
view. Do I need to perform some addition steps to overcome this? Is there a
cube that contains duration, project or task level?