B
Bobk
I have a project that has a split database. I normally make a copy of the
live back end and use it to test modifications to forms and reports, then
load the modified front end on the live workstations. I have in the past
manually modified tables or added small tables to the back end, as necessary,
only after shutting everyone out and backing up the live data. Note - I said
manually modified the live tables. The mods have been minor with no problems.
I now need to add three new tables consisting of a lot of data fields. I
have added them to my test back end and everything is working ok. Is there an
easy way to add these tables to the live back end, such as directly copying
them to the back end or do they have to be manually entered? If they can be
directly copied, what is the procedure? Can anyone give me some advice on
this?
live back end and use it to test modifications to forms and reports, then
load the modified front end on the live workstations. I have in the past
manually modified tables or added small tables to the back end, as necessary,
only after shutting everyone out and backing up the live data. Note - I said
manually modified the live tables. The mods have been minor with no problems.
I now need to add three new tables consisting of a lot of data fields. I
have added them to my test back end and everything is working ok. Is there an
easy way to add these tables to the live back end, such as directly copying
them to the back end or do they have to be manually entered? If they can be
directly copied, what is the procedure? Can anyone give me some advice on
this?