R
Robert
About a year ago (???) I came across a macro (???) that would adjust work for
a task based on the skill level of the resource that was ultimately assigned
the task. Work was estimated based on a "typical" resource with the required
skill.)
Now that I need it, I can't find it
Anybody remember this one?
TIA
a task based on the skill level of the resource that was ultimately assigned
the task. Work was estimated based on a "typical" resource with the required
skill.)
Now that I need it, I can't find it
Anybody remember this one?
TIA