D
Derek
I am amending all my holidays, birthdays and anniversaries in Outlook 2007,
due to Time Zone Changes in Western Australia (See Article ID 931667).
the problem is that all these are recurring all day events on an annual
basis. When I change a date e.g. Christmas Day it is showing a start time of
1am on 25 Dec 07 and an end time of 1am 26 Dec 07. When I try to change the
start and end times to 12am, it comes up with a warning Operation Failed.
I think I know the problem to this (the holiday still has two dates), but in
order to fix this I have to delete the recurrence and add it back in. This
is particulary annoying when all you need is an All Day Event tick box in the
Recurrence window to fix this problem.
Is there any other way to do this or do I have to keep on doing the above?
due to Time Zone Changes in Western Australia (See Article ID 931667).
the problem is that all these are recurring all day events on an annual
basis. When I change a date e.g. Christmas Day it is showing a start time of
1am on 25 Dec 07 and an end time of 1am 26 Dec 07. When I try to change the
start and end times to 12am, it comes up with a warning Operation Failed.
I think I know the problem to this (the holiday still has two dates), but in
order to fix this I have to delete the recurrence and add it back in. This
is particulary annoying when all you need is an All Day Event tick box in the
Recurrence window to fix this problem.
Is there any other way to do this or do I have to keep on doing the above?