L
LGroendijk
I'd like to refer to the following pictures.
http://img34.imageshack.us/img34/9091/deadlinevalues.gif
http://img19.imageshack.us/img19/8/nodeadlinevalues.gif
The first shows data as it is at the moment. The 0 values for Week34 an
Week38 are values which show up from the baseline (after project changes).
When I remove the baseline from the project the other picture shows up.
My question: I do not want the baseline values (0) to show up in my analysis
but I do want to keep track of the baseline in my project. Is this possible,
am I doing something wrong?
http://img34.imageshack.us/img34/9091/deadlinevalues.gif
http://img19.imageshack.us/img19/8/nodeadlinevalues.gif
The first shows data as it is at the moment. The 0 values for Week34 an
Week38 are values which show up from the baseline (after project changes).
When I remove the baseline from the project the other picture shows up.
My question: I do not want the baseline values (0) to show up in my analysis
but I do want to keep track of the baseline in my project. Is this possible,
am I doing something wrong?