Hi NG,
perhaps someone can help me on this :
I am trying to create a Gantt for an extremly short project (just 2,5 days)
with a lot of short steps. The problem is, 2/3 of the diagram are taken by
the non-working time. Is there any way to hide this time ?
If I zoom out, the 2hour lasting steps are too small to spot.
Thanks for your time reading this
Matthias Jenschke