I had a recent surprise after accepting time through the PWS. I had missed
posting the previous weeks time and I wanted to post just the prior week
before looking at the current week. I set the filter/view to the previous
week and accepted all of the time listed. When I went to analyze the
preformance of the project I saw both weeks had been posted.

Is there any way of limiting the time accepted to only the week viewable in
the interface or do I have to apply all time regardless?