M
marksuza
Hi, I was wondering if anybody could help me, should be somethin
simple. I created a graph with 3 data sets (cash expenses, credit car
expenses and total). The first two are bar graphs and the 'total' i
an area graph. Months are in the x-axis. The problem is: the are
portion is not starting where x would equal zero, there is a ga
between the area portion and the y-axis line. How do I fix that?
Thanks.
Mark
simple. I created a graph with 3 data sets (cash expenses, credit car
expenses and total). The first two are bar graphs and the 'total' i
an area graph. Months are in the x-axis. The problem is: the are
portion is not starting where x would equal zero, there is a ga
between the area portion and the y-axis line. How do I fix that?
Thanks.
Mark