M
MikeF
My project tasks are set to fixed units, effort driven. My reources'
assigned units are set at the task level to 75%. I enter the work for each
task. After scheduling and leveling, the resources assigned units change from
from 13% to 36,000 percent in each project. Why do the units change if I
have selected Fixed Units? Shouldn't the duration be the only atribute
changing (W=D*U)? Each project is linked into a master project. The master
is being leveled.