In A1 enter the first date. Select column A as far down as you need and make sure that A1 is the active cell. Then do Edit>Fill>Series and enter 14 as the step value.
Another way is to enter the first date in A1 and the second date in A2. Then select A1:A2 and fill down on A2 as far as needed.
HTH