I have the following data
phase 0 phase1 phase 2 phase 3 phase 4
A 1/1/2006 3/3/2006 5/5/2006 7/7/2006 9/9/2006
B 3/3/2006 5/5/2006 7/7/2006 11/11/2006 3/3/2007
When i try to create a bar chart(stacked) with this data the graph
automatically is created with the axis starting at 1900 instead of 2005
or 2006. Any thought on how to get the axis to 2005 or 2006... It looks
like the dates are being converted into numbers.
Thanks,
Sumit