Swansea Jack
Hi All
There has been a post similar so my apologies if this covers the same ground
...
I've created a simple programme (in MSP2007) and want a cheap'n'cheerful
method of plotting planned costs over time and tracking actual costs which
I'm inputting manually on a weekly basis.
I've added a 'fixed cost' to each task and baselined the project. But when I
try to run a visual report (sorry but I hate this feature in 2007, it was
much easier in 2003), the baseline cost for each task is zero.
Any help ? (OK I know I'm not doing this the right way for the purists - I
just wanted a quick graph !). Thanks.
There has been a post similar so my apologies if this covers the same ground
...
I've created a simple programme (in MSP2007) and want a cheap'n'cheerful
method of plotting planned costs over time and tracking actual costs which
I'm inputting manually on a weekly basis.
I've added a 'fixed cost' to each task and baselined the project. But when I
try to run a visual report (sorry but I hate this feature in 2007, it was
much easier in 2003), the baseline cost for each task is zero.
Any help ? (OK I know I'm not doing this the right way for the purists - I
just wanted a quick graph !). Thanks.