Baselines in master projects

G

gf

I would like to save a baseline to my master project, which consists of 10
subprojects, which are all part of a higher level program. I would like to
track actual costs and actual duration at the rolled-up summary level.
Project Pro 2003 allowed me to do this, but I was just wondering if anyone
has used Project in this way and had success with this.

regards,

G. Fritsch
 