J
Jetsonjock
I have been using Outlook 2000 and in the calendar my dates with items
scheduled are in bold. Today I upgraded to Outlook 2003 and the dates with
items scheduled are no longer in bold. How can I get this feature turned back
on?
As a second item; I have been able (outlook 2000) to import my work schedule
as a "Comma seperated" file with the .CSV extension. Now that I have upgraded
to Outlook 2003 and following the same proceedure, the calendar does not show
any longer any items that I have imported using this same proceedure.
scheduled are in bold. Today I upgraded to Outlook 2003 and the dates with
items scheduled are no longer in bold. How can I get this feature turned back
on?
As a second item; I have been able (outlook 2000) to import my work schedule
as a "Comma seperated" file with the .CSV extension. Now that I have upgraded
to Outlook 2003 and following the same proceedure, the calendar does not show
any longer any items that I have imported using this same proceedure.