G
GG
When I select "Build team from Enterprise", it is taking
over 6 minutes to load the resource pool names.
I only have 961 resources in the resources pool.
I thought that the RBS enterprise outline code
would begin to pre-filtering the list with this
number of users.
On our development server, the pre-filter is working
and I have about 1680 resources in this list.
Can the RBS pre-filtering be configured to begin
at a certain number of resources?
The performance is unacceptable at this point.
Any suggestions?