Hi. My report "rptProjectedCostSummaryFinal" has a subreport in the
budCCPIDFooter section "rsubCauseCodeAllocation". I would like to take a
field in the subreport divided by a field in the main report to get a
percentage.
The sub report field is:
=(IIf(IsNull([CON]),0,[CON]))+(IIf(IsNull([CO]),0,[CO]))+(IIf(IsNull([PCO]),0,[PCO]))+(IIf(IsNull([PM]),0,[PM])+(IIf(IsNull([NONCON]),0,[NONCON])))
The main report field is:
=Sum(ProjectedCosts)
I am not sure how do go about this calculation. For background the
subreport sums up cause allocations (base scope, errors & omissions, job
conditions, etc.). I would like to include what percent of total projected
costs each cause allocation is. Please let me know if you need more
information. And thank you as always for your help!!
Stacey
budCCPIDFooter section "rsubCauseCodeAllocation". I would like to take a
field in the subreport divided by a field in the main report to get a
percentage.
The sub report field is:
=(IIf(IsNull([CON]),0,[CON]))+(IIf(IsNull([CO]),0,[CO]))+(IIf(IsNull([PCO]),0,[PCO]))+(IIf(IsNull([PM]),0,[PM])+(IIf(IsNull([NONCON]),0,[NONCON])))
The main report field is:
=Sum(ProjectedCosts)
I am not sure how do go about this calculation. For background the
subreport sums up cause allocations (base scope, errors & omissions, job
conditions, etc.). I would like to include what percent of total projected
costs each cause allocation is. Please let me know if you need more
information. And thank you as always for your help!!
Stacey