A
ADIB
Hi,
in A1 there is date 1/25/2009 i want in B1 2/26/2009 after 30 days . can it
possible
please anyone solve the above
Thanks in advance
in A1 there is date 1/25/2009 i want in B1 2/26/2009 after 30 days . can it
possible
please anyone solve the above
Thanks in advance