S
scootr
There is a 700 feet rotating conveyor.
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.
How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.
I need a formula that can calculate this. Can somebody help me?
Moving at a rate of 7.5 feet per minute.
I know it takes 93 minutes to make one revolution.
How long will it take to get 500 parts off the line?
The parts are spaced 1 foot apart.
I need a formula that can calculate this. Can somebody help me?