Calculate / Report Total Project Resource Percentage

A

Andy

Hi

We have a 6 month project that have say 10 people working on the
project. I would like to get a percentage of work required for each
of the people for the duration of the project. For example, Mike will
be required 65% of his normal work week (average) for the duration of
the 6 month project. For each task I've listed their required
percentage of resource required.

Can I get this from MS Project 2007?

Andy
 