I just started using Infopath 2003 since early December. I created a
sales/factory tracking form where I have an initiation date at the top of the
form (using the date picker).

In a second table, that's a repeating table, I added another date picker.

- I need to calculate a response time difference between the initiation date
and the second date picker.
- Also, each time that a new row is added from the repeating table, I need
the response date to be calculated between the initiation date and the date
picker from the new row.

is this possible and how can I go about doing this?
 
P

Paresh

I just started using Infopath 2003 since early December. I created a
sales/factory tracking form where I have an initiation date at the top of the
form (using the date picker).

In a second table, that's a repeating table, I added another date picker.

- I need to calculate a response time difference between the initiation date
and the second date picker.
- Also, each time that a new row is added from the repeating table, I need
the response date to be calculated between the initiation date and the date
picker from the new row.

is this possible and how can I go about doing this?

Hi,

Take a look at the following links:
http://enterprise-solutions.swits.n...p?t=datediff-vbscript-infopath&c=infopath2003
http://blogs.msdn.com/infopath/archive/2005/01/25/360318.aspx

Thanks,
Paresh
 