Z
Zsolt Szabó
Hello everybody!
Here is my problem. I have a date (08/28/2008) in cell A1. The column A is
in date format *Wednesday, March 14, 2001. I have a second date in cell B1
09/26/2008.
I like to calculate every working (business) day between the two dates and
like to sort them under A1 in column A. The two dates in A1 and B1 should be
included on the list.
Here is my problem. I have a date (08/28/2008) in cell A1. The column A is
in date format *Wednesday, March 14, 2001. I have a second date in cell B1
09/26/2008.
I like to calculate every working (business) day between the two dates and
like to sort them under A1 in column A. The two dates in A1 and B1 should be
included on the list.