G
george
I am trying to create a formula that calculates production pounds per hour.
i have start time and stop time numbers that correctly return hours run in a
format of 00:00:00 (which is what i want). when calclating pounds per hour,
the time format in excel brings back an incorrect answer. i.e. A1=31,212
pounds produced, B1=15:10:00 (total runtime). A1/B1 brings and incorrect
answer of 49,390.4178. the answer should be in the 2 thousand range. please
help.
i have start time and stop time numbers that correctly return hours run in a
format of 00:00:00 (which is what i want). when calclating pounds per hour,
the time format in excel brings back an incorrect answer. i.e. A1=31,212
pounds produced, B1=15:10:00 (total runtime). A1/B1 brings and incorrect
answer of 49,390.4178. the answer should be in the 2 thousand range. please
help.