S
Shutez
Hi,
I am trying to make a monthly calendar that our administrator can update
easily with new dates, and mail out. I've formatted the calendar and it
looks great as it is right now for the month of April. However, when I
choose "change date range" it reverts back to the original formatting and I
have to start all over.
I realize this is because I used a "design object". However, if I don't use
a design object, then I can't change the date ranges.
How do I change the date range on my calendar without losing all the
formatting changes I made? Thanks
Tim
I am trying to make a monthly calendar that our administrator can update
easily with new dates, and mail out. I've formatted the calendar and it
looks great as it is right now for the month of April. However, when I
choose "change date range" it reverts back to the original formatting and I
have to start all over.
I realize this is because I used a "design object". However, if I don't use
a design object, then I can't change the date ranges.
How do I change the date range on my calendar without losing all the
formatting changes I made? Thanks
Tim