I am trying to find out if MS Project might be usefull for my job. W
organize the transport of material oversees. Let s say we have 8 tug
and 6 barges. There are 3 loading ports for 1 offloading port. No
every couple of days I look at the status of the barges and the tugs
and then manually link tug, barge and port to obtain a good circulatio
of the transports. Can Project help me find the optimal combination o
these 3 variables, and make a planning based o
sailing/loading/offloading times?
Or do you know another program which might be usefull for me?
Thanks in advanc
organize the transport of material oversees. Let s say we have 8 tug
and 6 barges. There are 3 loading ports for 1 offloading port. No
every couple of days I look at the status of the barges and the tugs
and then manually link tug, barge and port to obtain a good circulatio
of the transports. Can Project help me find the optimal combination o
these 3 variables, and make a planning based o
sailing/loading/offloading times?
Or do you know another program which might be usefull for me?
Thanks in advanc