Doug Patrone
We would like to extend the Timesheet to include three punch-in, punch-out
times for each day. The first is for the morning, the second is for lunch
and the third is for the afternoon. There is no need to track punch-in/outs
for each task, all that is required is to calculate a delta between the total
# of hours reported in all tasks for the day and the total # of hours based
on clock-in/out times. If there is a delta of 0, all time has been reported.
If it isn't 0, the manager can investigate.
As a developer, how would I prepare myself to provide a solution? I've
already downloaded the Project 2003 SDK, but haven't been able to
conceptualize a solution up to this point.
Any help (or general directions) would be most appreciated.
Thanks,
Doug
times for each day. The first is for the morning, the second is for lunch
and the third is for the afternoon. There is no need to track punch-in/outs
for each task, all that is required is to calculate a delta between the total
# of hours reported in all tasks for the day and the total # of hours based
on clock-in/out times. If there is a delta of 0, all time has been reported.
If it isn't 0, the manager can investigate.
As a developer, how would I prepare myself to provide a solution? I've
already downloaded the Project 2003 SDK, but haven't been able to
conceptualize a solution up to this point.
Any help (or general directions) would be most appreciated.
Thanks,
Doug