G
gg
Is it possible to have a calculated date field that can also be overriden if
user wants to provide a user inputted date instead?
My formula in the control source is currently:
Contract_end_dat
=IIf([optChoose]=1,DateAdd("m",nz([Term_mos]),nz([Acceptance_date]))-1,DateAdd("ww",nz([Term_mos]),nz([Acceptance_date]))-1)
However, is it better to create a separate end_date_override field or simply
have user type over the calculated end date? This calculated
contract_end_date is also used in the subform detail screen.
Thank you!
gg
user wants to provide a user inputted date instead?
My formula in the control source is currently:
Contract_end_dat
=IIf([optChoose]=1,DateAdd("m",nz([Term_mos]),nz([Acceptance_date]))-1,DateAdd("ww",nz([Term_mos]),nz([Acceptance_date]))-1)
However, is it better to create a separate end_date_override field or simply
have user type over the calculated end date? This calculated
contract_end_date is also used in the subform detail screen.
Thank you!
gg