D
David Dufour
Hi everyone,
I would like to know if it is possible to change the actual work unit from
days to hours in the PWA 2007 interface ?
Thanks in advance.
I would like to know if it is possible to change the actual work unit from
days to hours in the PWA 2007 interface ?