R
RyanH
I have a SheetChart that has two vertical columns for each of the 17
departments that we have at our company along the X-Axis and Hours along the
Y-Axis. My SourceData is in Sheets("Summary"), Col. C represents Available
Hours and Col.D represents Scheduled Hours. I want to have the ability to
graph each of the 5 Weeks on the same SheetChart. What I would like to do is
embed a ScrollBar that would change the SourceData from Week 1 --> Week 2,
Week 2 --> Week 3, ... , Week 4 --> Future, and visa versa.
I think the best way to setup the code is to change the SourceData row
numbers as the ScrollBar Value changes. For example, ScrollBar.Value = 1
and Week 1 SourceData = Sheets("Summary").Range("C1010,C1818,C2626,
etc."), ScrollBar.Value = 2 and Week 2 SourceData = Sheets("Summary").Range
("C1111,C1919,C2727, etc."), and so on. The ScrollBar Value Min. = 1
and Max. = 5.
Col. C Col.D
Department 1 of 17:
Available Hrs Scheduled Hrs
Week 1 40 40
Week 2 80 50
Week 3 40 30
Week 4 0 0
Future 120 15
Department 2 of 17:
Available Hrs Scheduled Hrs
Week 1 40 40
Week 2 80 50
Week 3 40 30
Week 4 0 0
Future 120 15
And so on....
Note: I have Excel 2003.
Hope this explains everything! Thanks in Advance!
departments that we have at our company along the X-Axis and Hours along the
Y-Axis. My SourceData is in Sheets("Summary"), Col. C represents Available
Hours and Col.D represents Scheduled Hours. I want to have the ability to
graph each of the 5 Weeks on the same SheetChart. What I would like to do is
embed a ScrollBar that would change the SourceData from Week 1 --> Week 2,
Week 2 --> Week 3, ... , Week 4 --> Future, and visa versa.
I think the best way to setup the code is to change the SourceData row
numbers as the ScrollBar Value changes. For example, ScrollBar.Value = 1
and Week 1 SourceData = Sheets("Summary").Range("C1010,C1818,C2626,
etc."), ScrollBar.Value = 2 and Week 2 SourceData = Sheets("Summary").Range
("C1111,C1919,C2727, etc."), and so on. The ScrollBar Value Min. = 1
and Max. = 5.
Col. C Col.D
Department 1 of 17:
Available Hrs Scheduled Hrs
Week 1 40 40
Week 2 80 50
Week 3 40 30
Week 4 0 0
Future 120 15
Department 2 of 17:
Available Hrs Scheduled Hrs
Week 1 40 40
Week 2 80 50
Week 3 40 30
Week 4 0 0
Future 120 15
And so on....
Note: I have Excel 2003.
Hope this explains everything! Thanks in Advance!