I have some resources that have changing availibilities due to leave &
other requirement.
Is there a way I can change the availability/ quanity (max units) of a
resource for a period(s).
Eg. There are normally 2 fitters available, but for the period from X
to Y, only 1 is available
I require this for using resource leveling, please don't laugh, but i
have 700+ tasks that are quite complexly networked, and limited
resources
Thnaks
Peter
other requirement.
Is there a way I can change the availability/ quanity (max units) of a
resource for a period(s).
Eg. There are normally 2 fitters available, but for the period from X
to Y, only 1 is available
I require this for using resource leveling, please don't laugh, but i
have 700+ tasks that are quite complexly networked, and limited
resources
Thnaks