G
godrid
Hi,
I just couldn't locate the steps on how to change the progress report method
for a project in Project Server 2003 if we set the "Allow project manager to
change the default method for reporting progress if a different method is
appropriate for a specific project" in the lock down defaults tracking
settings.
Any clues??? Thanks.
I just couldn't locate the steps on how to change the progress report method
for a project in Project Server 2003 if we set the "Allow project manager to
change the default method for reporting progress if a different method is
appropriate for a specific project" in the lock down defaults tracking
settings.
Any clues??? Thanks.