MS Project 2003 (11.2.2005.1801.15) SP2 Project Server 2003 SP1
A project schedule shows checked out in the "check in enterprise projects"
under admin--Check out 5/31/2006 5:38 AM. Under file/open from server it
also shows checked out = yes by same person. The last modified date is
5/25/06 3:22 PM. Is the check out date when it was checked out and 5/25 the
last time it was saved? When a copy is made from a read only it will be a
copy of the last saved schedule even if it is checked out, right?
Thanks