Code for built in MS Project Macro

M

M.Edwards

Any ideas on how to see the code used to elicit
the "Adjust Dates" function (from the Analysis toolbar)
within MS Project Pro? We'd like to setup similar buttons
using other date fields, and would like to leverage the
code used in that function.

thanks!
 
J

John

M,
If you have access to Project 98, the code for that add-in (and Analysis
toolbar add-ins) was readily available in the Global. However, although
the code for "analyze timescaled data in Excel" is available from the
Microsoft website at:
http://www.microsoft.com/downloads
I don't know if the code for "Adjust Dates" is available.

John
 
M

M.Edwards

Thanks for the info, John.

Unfortunately, I don't have access to Proj98, nor do I see
the code available on the Microsoft download section for
the "Adjust Dates" macro.

If anyone out there is running 98, and feeling extra
generous, could you please post the macro code here?

thanks!
 
J

John

M,
Let me check to see if I am allowed to do that. If I can, I will send it
to you via e-mail - it is too complex to post. First let me test the
water. If all is ok I will post again so you can send me your e-mail.
This may take a few days.

John
 
M

M.Edwards

John - Thank you so much for your help. I was able to get
ahold of a 98 cd here, and will check out the macro that
you identified.

Again, I really appreciate your effort on this.
 
J

John

M,
Great, although I haven't received an answer back on whether I could
send the code, my feeling is that it would not be legal.

Good luck with modifying the "canned" code. However, you may find it
easier to simply develop your own code to adjust the dates.

John
 