S
sal21
This is a simple planninig of vacation i would want a macro assigned i
to a botton in the sheet FERIESA_FATTE that make:
click on the botton and automaticly from every line of the shee
FERIESA_FATTE, this macro colorized the 2 other sheet in base of th
month example:
36755 6500 D'AGOSTINO NICOLA
have arange 02/01 05/01 colorozie in red with a little border the shee
PRIMO_SEMESTRE range E6:H6
have arange 15/03 colorozie in red with a little border the shee
PRIMO_SEMESTRE range BZ6
have arange 14/07 16/07 colorozie in red with a little border the shee
SECONDO_SEMESTRE range Q6:S6
i hope to be clear...
Attachment filename: calendar.zip
Download attachment: http://www.excelforum.com/attachment.php?postid=63267
to a botton in the sheet FERIESA_FATTE that make:
click on the botton and automaticly from every line of the shee
FERIESA_FATTE, this macro colorized the 2 other sheet in base of th
month example:
36755 6500 D'AGOSTINO NICOLA
have arange 02/01 05/01 colorozie in red with a little border the shee
PRIMO_SEMESTRE range E6:H6
have arange 15/03 colorozie in red with a little border the shee
PRIMO_SEMESTRE range BZ6
have arange 14/07 16/07 colorozie in red with a little border the shee
SECONDO_SEMESTRE range Q6:S6
i hope to be clear...
Attachment filename: calendar.zip
Download attachment: http://www.excelforum.com/attachment.php?postid=63267