HELP! I need help with a complex sum formula. The data outlined below
contains over 1,000 rows and I need to build the matrix titled "Desired
Result" that summarizes forecasted task completions by quarter. There are 5
different engineering groups so the Engineering formula will need to look for
projects that start with "Engineer". There are 10 different projects in
column A and I have no problem with a separate formula for each project.
I hope the DATA and RESULT and self-explanatory. I could not copy them in
Excel format. For future reference, is an Excel copy possible?
DATA
Column A T U V W
Project Quarter Current Next Future
Engineering 2 4Q08 1
Engineering 1 3Q09 1
Engineering 2 2Q10 1
Engineering 3 3Q09 1
Design 3Q09 1
Design 1Q10 3
Desired Result
Quarter 4Q08 1Q09 2Q09 3Q09 4Q09 1Q10
Engineering
Current Year 1
Next Year 2
Future Years 1
Design
Current Year
Next Year
1
Future Years 3
contains over 1,000 rows and I need to build the matrix titled "Desired
Result" that summarizes forecasted task completions by quarter. There are 5
different engineering groups so the Engineering formula will need to look for
projects that start with "Engineer". There are 10 different projects in
column A and I have no problem with a separate formula for each project.
I hope the DATA and RESULT and self-explanatory. I could not copy them in
Excel format. For future reference, is an Excel copy possible?
DATA
Column A T U V W
Project Quarter Current Next Future
Engineering 2 4Q08 1
Engineering 1 3Q09 1
Engineering 2 2Q10 1
Engineering 3 3Q09 1
Design 3Q09 1
Design 1Q10 3
Desired Result
Quarter 4Q08 1Q09 2Q09 3Q09 4Q09 1Q10
Engineering
Current Year 1
Next Year 2
Future Years 1
Design
Current Year
Next Year
1
Future Years 3