Hi,
I am very new to Proj Server, but I have a task to copy a production server
over to a test server, but with the production data in it.
The environment in W2K3 sp1, SQL Server, Analysis Server, Report Server,
SharePoint Services and Project Server 2003 all installed on the same machine.
I have installed the above on "TEST01" as a new install fine and all looks
good, but when I try to copy the production DBs over to test, opening Project
Server website it says can't connect to the server. Looking within the Dbs,
the machine name is located in many tables...![Frown :( :(](data:image/gif;base64,R0lGODlhAQABAIAAAAAAAP///yH5BAEAAAAALAAAAAABAAEAAAIBRAA7)
Can someone tell me what more i should be doing other than the normal "PM
W2K3 single server install" to get this to work on a box with a different
machine name?
Many Thanks. Please let me know if you need more info...
I am very new to Proj Server, but I have a task to copy a production server
over to a test server, but with the production data in it.
The environment in W2K3 sp1, SQL Server, Analysis Server, Report Server,
SharePoint Services and Project Server 2003 all installed on the same machine.
I have installed the above on "TEST01" as a new install fine and all looks
good, but when I try to copy the production DBs over to test, opening Project
Server website it says can't connect to the server. Looking within the Dbs,
the machine name is located in many tables...
Can someone tell me what more i should be doing other than the normal "PM
W2K3 single server install" to get this to work on a box with a different
machine name?
Many Thanks. Please let me know if you need more info...