Cost (Actual Cost and ACWP) columns problem

J

John

There is a project manager that has a project on the Project Server (2002).
He has filled in the Actual Cost column, but the ACWP column is not equal to
Actual Cost. From my understanding they should be equal to each other. Is
there a reason why they are out of sync? What causes this and what can I do
to get it back into sync? (I've already checked the auto/manual calculation
tab - it is set to auto)


Thank

John
 