J
Jeff
Hello (using version 2002
I am attempting to do some very basic cost loading in MS Project. I have a projects as tasks and I just want to generate a very simple cumulative cost curve using the Resource Graph. I want the cost to just spread across the timeline of the project (task). So far I am using the fixed cost field to load costs onto each project(task) and I have tried to get the Resource Graph to display a cumulative cost curve without using any resources. Is this possible? I don't want to use the "Analyze Timescaled Data in Excel" because I want to be able to print out the resource graph and the Gantt on the same page. If I need to use resources to get the resource graph to work can someone please give me steps involved? Thanks in advance.
I am attempting to do some very basic cost loading in MS Project. I have a projects as tasks and I just want to generate a very simple cumulative cost curve using the Resource Graph. I want the cost to just spread across the timeline of the project (task). So far I am using the fixed cost field to load costs onto each project(task) and I have tried to get the Resource Graph to display a cumulative cost curve without using any resources. Is this possible? I don't want to use the "Analyze Timescaled Data in Excel" because I want to be able to print out the resource graph and the Gantt on the same page. If I need to use resources to get the resource graph to work can someone please give me steps involved? Thanks in advance.