L
Lisa
I need to be able to count the number of times a meeting is scheduled (did
that) as well as the number times a meeting is canceled.
Assigned County Date
Occurred
FTM Worker Zip Code Time Frame Race Cancled,
or CO for Carry Over
to next mont
J. Finley Harris Other 3/3/2010
K. Gonzales Harris Other H Cancled
V. Glenn Harris Other H 3/3/2010
A. Elliott-Wilson Harris Other B 3/3/2010
K. Gonzales Harris Other W 3/4/2010
L. Lopez Harris 24 co
in the first column I used countif for each person's name to get the number
of times they have a meeting scheduled. There are other columns before the
name that are not relative to this issue. the 3 middle columns are also not
relaive and are just part of the spread sheet. In the last column I have
several countif to count if the meeting was held, cancled or carried over
(co). I need to be able to count the number of times each person actual
conducts there meetings.
Example:
K Gonzales has two meeting scheduled but only 1 actually took place becasue
it was cancled
L Lopez has 1 meeting scheduled but it was carried over to the next month.
How do I get excel to give me those numbers... Help, this is the last stat
that I am unable to calculate....
that) as well as the number times a meeting is canceled.
Assigned County Date
Occurred
FTM Worker Zip Code Time Frame Race Cancled,
or CO for Carry Over
to next mont
J. Finley Harris Other 3/3/2010
K. Gonzales Harris Other H Cancled
V. Glenn Harris Other H 3/3/2010
A. Elliott-Wilson Harris Other B 3/3/2010
K. Gonzales Harris Other W 3/4/2010
L. Lopez Harris 24 co
in the first column I used countif for each person's name to get the number
of times they have a meeting scheduled. There are other columns before the
name that are not relative to this issue. the 3 middle columns are also not
relaive and are just part of the spread sheet. In the last column I have
several countif to count if the meeting was held, cancled or carried over
(co). I need to be able to count the number of times each person actual
conducts there meetings.
Example:
K Gonzales has two meeting scheduled but only 1 actually took place becasue
it was cancled
L Lopez has 1 meeting scheduled but it was carried over to the next month.
How do I get excel to give me those numbers... Help, this is the last stat
that I am unable to calculate....