M
mike tovcimak
Two questions for MS Project 2000
1. I want to create my own image for a graphical
indicator. Is it possible add graphical indicators other
than the standard 50+ images that come with the base
program.
2. Is it possible to display mulitple images for an
indicator. I want to display a clock if the task is
behind schedule, a dollar sign if the task is over budget,
and both the clock and dollar sign if the task is behind
schedule and over budget.
Thanks in advance.
Mike
1. I want to create my own image for a graphical
indicator. Is it possible add graphical indicators other
than the standard 50+ images that come with the base
program.
2. Is it possible to display mulitple images for an
indicator. I want to display a clock if the task is
behind schedule, a dollar sign if the task is over budget,
and both the clock and dollar sign if the task is behind
schedule and over budget.
Thanks in advance.
Mike