I created a Sharepoint workspace before a project plan was ready to be
published (working with a vendor needed to set things up fast). Now I can
for the life of me figure out how to link the project plan to that workspace
I created. Do I need to rebuild the whole thing or is there a setting I'm
missing (please say there is a setting).
When i go to provision under an existing workspace it will only show me
workspaces that were generated via project publishing.