J
Jack at ArcLight
Hi All:
I have a number value for an investment db that corresponds to the
maintenance priority of that investment (priority 1,2 and 3). The higher
priority, the more attention that needs to be paid to the investment.
HR has a method of assigning a workload score to an investment based on its
priority: 1= workload score of 5, 2=3 and 3=1.
Can I create a query that will automatically assign these values to total
for a total workload score without having a separate field to enter the
workload value?
Hope this makes sense.
I have a number value for an investment db that corresponds to the
maintenance priority of that investment (priority 1,2 and 3). The higher
priority, the more attention that needs to be paid to the investment.
HR has a method of assigning a workload score to an investment based on its
priority: 1= workload score of 5, 2=3 and 3=1.
Can I create a query that will automatically assign these values to total
for a total workload score without having a separate field to enter the
workload value?
Hope this makes sense.