S
Shelley
I need to produce multiple Powerpoint presentations that link to Excel data.
The Powerpoint does not change, only the Excel data values. We want to save
everything for reference. I thought that I could do this by creating a model
Powerpoint and Excel “set†in the same folder, then copying the folder and
changing the Excel data. I expected that doing this would result in the
Powerpoint data automatically being updated. It works most of the time, but
not always. This morning I can’t get it to work at all; the new Powerpoint
still points to the Excel data in the previous location.
Should this method work? If not, what can I do to mass produce these
presentations with identical formats, but different data?
The Powerpoint does not change, only the Excel data values. We want to save
everything for reference. I thought that I could do this by creating a model
Powerpoint and Excel “set†in the same folder, then copying the folder and
changing the Excel data. I expected that doing this would result in the
Powerpoint data automatically being updated. It works most of the time, but
not always. This morning I can’t get it to work at all; the new Powerpoint
still points to the Excel data in the previous location.
Should this method work? If not, what can I do to mass produce these
presentations with identical formats, but different data?