P
PatLac
Hi,
I am constantly getting this error when I try to build the cube on my
Project 2007 installation. (sorry for the french...)
Type de l'événement : Erreur
Source de l'événement : Office SharePoint Server
Catégorie de l'événement : (1670)
ID de l'événement : 7689
Date : 24/10/2007
Heure : 11:00:28 PM
Utilisateur : N/A
Ordinateur : SPQCMSP01
Description :
PSI Entry Point:
Project User: SPQCMSP01\WSSAdmin
Correlation Id: ac8673bc-7e87-4bdb-ba22-74062a9a32ea
PWA Site URL: http://project.exfo.com/PWA
SSP Name: SSP Prod
PSError: CBSMetadataProcessingFailure (17005), Setting
UID=00007829-4392-48b3-b533-5a5a4797e3c9 ASServerName=SPQCMSP01
ASDBName=PS_EXFO ASExtraNetAddress= RangeChoice=0 PastNum=1 PastUnit=0
NextNum=1 NextUnit=0 FromDate=10/24/2007 14:14:14 ToDate=10/24/2007 14:14:14
HighPriority=False, Invalid call to GetJoinForCustomFieldDimension. Cannot
join "Task Non Timephased" fact with a custom field of entity Assignment.
I tried everything I could think of:
- Removed custom configuration elements from the cube
- Forced the synchronisation of all enterprise custom fields (by changing
their name for example)
- Forced the synchronisation of all my enterprise resources
- Saved and re-published ALL of the projects
The queue seems to be fine (well, as much as can be...) it needs to be
restarded every once in a while.
What else can I try ?? Can I delete everything in the reporting DB ?
Thanks !
Patrice
I am constantly getting this error when I try to build the cube on my
Project 2007 installation. (sorry for the french...)
Type de l'événement : Erreur
Source de l'événement : Office SharePoint Server
Catégorie de l'événement : (1670)
ID de l'événement : 7689
Date : 24/10/2007
Heure : 11:00:28 PM
Utilisateur : N/A
Ordinateur : SPQCMSP01
Description :
PSI Entry Point:
Project User: SPQCMSP01\WSSAdmin
Correlation Id: ac8673bc-7e87-4bdb-ba22-74062a9a32ea
PWA Site URL: http://project.exfo.com/PWA
SSP Name: SSP Prod
PSError: CBSMetadataProcessingFailure (17005), Setting
UID=00007829-4392-48b3-b533-5a5a4797e3c9 ASServerName=SPQCMSP01
ASDBName=PS_EXFO ASExtraNetAddress= RangeChoice=0 PastNum=1 PastUnit=0
NextNum=1 NextUnit=0 FromDate=10/24/2007 14:14:14 ToDate=10/24/2007 14:14:14
HighPriority=False, Invalid call to GetJoinForCustomFieldDimension. Cannot
join "Task Non Timephased" fact with a custom field of entity Assignment.
I tried everything I could think of:
- Removed custom configuration elements from the cube
- Forced the synchronisation of all enterprise custom fields (by changing
their name for example)
- Forced the synchronisation of all my enterprise resources
- Saved and re-published ALL of the projects
The queue seems to be fine (well, as much as can be...) it needs to be
restarded every once in a while.
What else can I try ?? Can I delete everything in the reporting DB ?
Thanks !
Patrice