I have a question that I'm absolutely stumped on. This has to do with the
hotfix that MSP put in place for the Cost & Schedule Add on. I have a
project that is showing the PV hours and the EV hours as the same. I was
wondering if anyone can help me determine why these two values would be
reflecting the same. Thanks Pearl