Y
YonZo
Hi All!
Our customer has installed Project Server 2007, and created two PWA-sites on
this installation - one for production, and one for training.
They (we) have defined two different cubes (or Analysis Services Databases)
for the two sites, both residing on the same server.
The problem is that the Data Analysis reports in the training environment is
displaying data registered in the production-site...!?!
I have confirmed that correct parameters are entered in the "Cube Build
Settings"-window.
Do you have any other suggestions where to look for this "connection
crossing"??
Our customer has installed Project Server 2007, and created two PWA-sites on
this installation - one for production, and one for training.
They (we) have defined two different cubes (or Analysis Services Databases)
for the two sites, both residing on the same server.
The problem is that the Data Analysis reports in the training environment is
displaying data registered in the production-site...!?!
I have confirmed that correct parameters are entered in the "Cube Build
Settings"-window.
Do you have any other suggestions where to look for this "connection
crossing"??