H
Hank Stalica
Ok, I have three fields. FieldA, FieldB, and FieldC. FieldA has a
date. If FieldB is null, I would like FieldC to = FieldA + 30 days.
Can someone point me in the right direction to do this?
Thanks,
--Hank
date. If FieldB is null, I would like FieldC to = FieldA + 30 days.
Can someone point me in the right direction to do this?
Thanks,
--Hank